Project Overview
This project successfully delivered three 8-ton truss-type semi-gantry cranes to a logistics client at Haiphong Port, Vietnam. We provided a customized compact design and an environmentally adaptive solution to address the client’s challenges of limited space and harsh operating conditions, backed by comprehensive localized support. After commissioning, the client’s handling efficiency increased by over 35%, leading to a repeat order.

Customer Requirements
Our client, a growing logistics service provider in Haiphong, needed to solve a material handling bottleneck in a new open-yard storage area. Their requirements were specific:
1.Space Constraints: The cranes had to be installed on existing, fixed concrete runways with limited width to maximize space utilization without new construction.
2.Harsh Environment:The equipment must withstand Vietnam’s high temperature, humidity, and salty air typical of a tropical maritime climate, ensuring long-term durability and minimal downtime.
3.Local Capacity Building:They required user-friendly operation and comprehensive localized training for their team to perform future maintenance independently.
Solution
We provided the customer with the following configuration:
1.Compact, Customized Design:
We employed a mechanically optimized truss-type main girder design. This achieved a lightweight and compact structure that fully met the 8-ton capacity and span requirements while perfectly fitting the client’s pre-laid runway foundations, eliminating any need for modification.


2.Enhanced Environmental Protection:
Corrosion Resistance: All steel structures received a heavy-duty anti-corrosion coating, with reinforced treatment at all welding points.
Electrical Component Protection: Key electrical components were rated IP55 and selected for high-temperature resistance to ensure reliability in the humid climate.

3.Comprehensive Localized Support:
Local Language Documentation: Provided complete operation and maintenance manuals in Vietnamese.
On-Site Training: Dispatched engineers to Vietnam for a two-week, hands-on training program for the client’s operators and maintenance staff.
Parts Support: Established a local stock of common spare parts and committed to providing rapid remote technical assistance.
Client Feedback
After three months of stable operation, the client provided positive feedback:
“We are highly satisfied with this partnership. The Chinese manufacturer provided not only high-quality equipment but, more importantly, impressive deep-customization capabilities and professional localized support. These three semi-gantry cranes perfectly meet our strict spatial limitations and have performed reliably in the hot and humid weather. Our team is now proficient in daily maintenance. The equipment has significantly improved cargo turnover efficiency in our yard.”
Project Results
Improved Operational Efficiency: The client reported a 35%+ increase in loading/unloading efficiency in the designated storage area.
Cost-Effectiveness: The solution was completed within the customer’s budget, with straightforward and affordable maintenance.
Repeat Order: Based on this successful experience, the client recently placed a repeat order for an additional crane of the same model for a new warehouse expansion.
This case demonstrates our ability to provide practical and adaptable lifting solutions for customers of varying scales. We focus on the reliability and operational convenience of the equipment in real-world scenarios, ensuring that every crane we deliver integrates seamlessly into our customers’ workflows and creates lasting value.